ORION
BUILDERS OF CALIFORNIA
CLASS B LICENSE #1062010
Build With Us Today
858.922.5112

Build Smarter. Build Faster.
Traditional cast-in-place podiums kill schedules, drain budgets, and tie up crews.
Orion Podium fixes that.
Our pre-engineered hollowcore system installs in days—not months.
No curing. No delays. Just results.
Why Orion Podium?
Faster Installs. Fewer Trades. Lower Costs.
-
Speed — Install 12,000 sq. ft. floor plates in as little as 4 days
-
Efficiency — No formwork, fewer trades, reduced labor
-
Flexibility — Long spans + slim floors with integrated fire resistance
-
Precision — Pre-manufactured for accuracy, no costly field fixes
-
Savings — Lower labor, material waste, and foundation costs
-
Sustainability — Less waste, fewer trucks, faster access for trades
Advanced Technology
DELTABEAM® + Hollowcore = Maximum Flexibility.
Slimmer floors. Stronger spans. Smarter builds.
-
Long, column-free spans for flexible layouts
-
Slim floor designs that maximize usable space
-
Reduced shoring needs, giving trades faster access
-
Lighter structure = potential foundation savings
FAQs
Everything cast-in-place struggles with—we solved.
How does it compare to cast-in-place?
Weeks faster. Cleaner. Less labor. No formwork, rebar congestion, curing, or post-tension delays.
Can it work on sloped or irregular sites?
Yes. We work with your design team to customize beam and plank layouts.
Is it approved in seismic zones?
Absolutely. Meets or exceeds seismic, fire, and sound codes across U.S. jurisdictions.
What’s the lead time?
Typically 8–10 weeks from design approval. Pilot projects may fast-track.
Why Choose Precast?
Your schedule shouldn’t be your enemy.
Cost certainty from day one.
-
Guaranteed Faster Delivery — Half the time of cast-in-place
-
Locked-In Pricing — Fixed $/SF from day one (design → erection)
-
Fully Coordinated Package — Structural + MEP + elevators + stairs
-
Permitting Support — Stamped plans and code analysis for AHJs
See If It Fits Your Project
15 minutes could save you months.
No pressure. No pitch. Just answers.
We’ll run your project through our system to determine if it qualifies for our Precast Podium Express system — in terms of technical feasibility, cost-effectiveness, and time savings.
Your Next Step Starts Here
Contact Us Today
Orion Podium Hollowcore systems cut construction time, lower costs, and reduce environmental impact—all while ensuring safety and durability. Using DELTABEAM® technology, they enable long spans, slim floors, flexible layouts, and integrated fire resistance. Pre-engineered connections and 3D BIM modeling prevent errors and delays, and the lightweight structure reduces foundation needs. Floor plates up to 12,000 sq. ft. can be installed in just four days, with full site access the next day, transforming construction efficiency.